Rubber dam
Rubber dam Construction process
- 1. Rubber dam Mat foundation arrangement
- 2. Concrete pouring
- 3. Upper floor finish
- 4. Downstream of the floor finish
- 5. Floor finish bottom gasket
- 6. Bottom gasket punch
- 7. Punch in place sponge strip
- 8. Dam bag open
- 9. Hoisting dam bag
- 10. The dam bag in place
- 11. Mechanical bolt
- 12. The installation completed
- 13. Butter to protect the bolts
- 14. Plastic bags to protect
- 15. Concrete protection linking piece bolt
- 16. Rubber dam to complete the effect